Service · Consumer Unit Upgrade
The half-day job that every Canterbury property with a pre-2016 board needs eventually. Metal-enclosed consumer unit, dual-RCD split-load or all-RCBO configuration, Type 2 surge-protection device fitted as standard.
These are the boards that flag on nearly every EICR I run in Canterbury:
Amendment 2:2022 to BS 7671:2018 took effect for new installations from 27 September 2022. The main changes that affect a consumer unit swap:
Listed properties inside the walls. The board itself is not a listed feature, but the run of any new circuit into a listed elevation or the surface conduit route back from an updated meter position needs a scope conversation first. If the sub-main from meter to board is being re-run and the route crosses a listed corridor or a lath-and-plaster wall, that is a Listed Building Consent conversation with Canterbury City Council.
DNO isolation. UK Power Networks are usually 24–48 hours out for a scheduled cut of the meter tails to re-seal. I book the DNO slot on your behalf and quote the job for the day the DNO can come. Emergency isolation is available where the existing board is actively dangerous.
Metering. If you have a Smart Meter fitted after 2018, the isolation is by the supplier not the DNO. That is a different call and a different timeline.
Not automatically. BS 7671 does not require retroactive replacement - an existing installation is not made non-compliant by the publication of a new Amendment. But if an EICR codes the board C1 (danger) or C2 (potentially dangerous) it needs to be replaced to keep the certificate satisfactory. In practice, any pre-2000 board and most 2000–2015 single-RCD boards will C2 or C3 today.
Half a day of on-site work on a standard 8-way to 12-way board once the DNO has cut the tails. The DNO isolation slot is the pacing item - usually 24 to 48 hours notice at UK Power Networks. Full test, inspection and certificate on the same day.
If the existing main earth conductor is undersized against the current PSCC or the main bonds to gas and water are 6mm² or less, yes - the earthing upgrade is quoted alongside the board because a new board on undersized earthing is not compliant and would flag C2 at the very next EICR.
Consumer unit upgrades on a Canterbury property start from £600. All-RCBO spec, AFDD retrofit or larger boards (10+ circuits) push higher. Includes the SPD, the DNO isolation coordination, testing, EIC and the Building Regulations compliance certificate. Fixed price quoted in advance after property details and scope. No day-rate creep, no surprise extras.
Standards on every job
BS 7671:2018 Amendment 2 Part P self-certified Fixed price Compliance cert within a fortnightPhotos and postcode to hello@canterburyelectrical.co.uk or call 07763 100 477. Same-day reply on straightforward jobs. WhatsApp works too.
Send a couple of photos and a postcode. Same-day fixed price on straightforward jobs, honest turnaround on the rest.